Detroit deconstruction work begins.
- haydntaylor
- Dec 10, 2014
- 1 min read
We have started demo work in the new Detroit building, all be it slowly as we are not there much yet. We have hired some help to get things started though.
Step one is to demo out all the old sheetrock from the existing bathrooms and the old showroom/retail room. We are now back to bare studs and are working on cleanup of the whole place to get ready for construction to begin.
We also rodered the new high security oversized roll up door. This should be installed the week of January 5th, which means the RV can be driven out and parked in the building to act as a temporary home until the spring.
Check out the full gallery here: http://www.htmotorworks.com/#!detroit-facility-work/c1fgp